Battery energy storage solution at Columbia Energy Center


Alliant Energy is developing an 18-megawatt (MW)/180 megawatt-hour (MWh) CO2 battery long-duration energy storage solution at the existing Columbia Energy Center in Pardeeville, Wisconsin. Alliant Energy has contracted the equipment engineering and supply with Energy Dome, U.S. Inc., an Italian founded company. We have engaged an Engineer of Record (HDR) to develop the engineering specifications for construction at our Columbia Energy Center site in Wisconsin. This will be the first project constructed in the United States with the Energy Dome solution, and the second project of this size in the world. The BOP final completion date is currently forecasted for Q2-Q3 of 2028.

The CO2 battery is a long duration, large-scale energy storage system based on a thermodynamic process that efficiently stores energy by manipulating CO2 under different conditions in a closed thermodynamic transformation. The CO2 battery can operate in charging mode, absorbing power from the grid; and discharging mode, returning power to the grid.

Alliant Energy is receiving federal funding support for this project through the IIJA Long-Duration Energy Storage (LDES) Demonstrations Program from the U.S. Department of Energy’s (“DOE”) Office of Clean Energy Demonstrations (“OCED”). The project requires execution per the DOE requirements, which is a gated execution methodology where the phases are sequential and do not overlap.

Alliant Energy requests proposals for Balance of Plant services per the requirements listed herein. Given the nature of this new technology, Alliant Energy is looking for a partner that brings a diverse offering of professional services to support project success.

Click to request admittance to the initial phase of the RFP